INT 220 • Four Lands Investment Series

THE OLI INVESTMENT DECISION

Venturea is preparing a major foreign expansion. Your task is to use Dunning's Eclectic (OLI) framework to determine which of four proposed investments provides the strongest strategic logic for foreign direct investment.

2–3 page APA report Four fictional countries Ownership • Location • Internalization Evidence-based recommendation
THE DECISION

Why FDI—and where?

Venturea's board has authorized management to select one of four investment proposals. Each proposal would place Venturea assets, employees, and capital inside a foreign country rather than serving that country only through exports.

The proposals are intentionally mixed. Some offer clear strategic fit; others require students to weigh timing, risk, control, and whether Venturea's advantages are strong enough to justify direct ownership abroad.

Your role: You are a junior international strategy analyst. Recommend one project and support the recommendation using the OLI framework. You are not being asked to identify the country with the largest GDP or the lowest cost alone.

Dunning's Eclectic Framework

OOwnership
Does Venturea possess firm-specific assets or capabilities strong enough to overcome the disadvantages of operating abroad?
LLocation
Is there an advantage to performing the activity in this country rather than at home or in another market?
IInternalization
Does Venturea gain more by controlling the activity itself than by licensing, contracting, franchising, or relying on an outside partner?

The strongest FDI case usually requires all three elements to work together. A good location alone does not establish that direct ownership is the best entry mode.

How to use this packet

Browse the Venturea profile and all four project pages. The economic, operating, social, and cultural indicators are scenario data created for the Four Lands case. They are intended to be analyzed comparatively rather than treated as real-country statistics.

Look for fit

Connect Venturea's proprietary capabilities to the specific project. Ownership advantage is about Venturea, not the country.

Look for tradeoffs

Cheap labor, incentives, and market growth can be offset by weak infrastructure, capital controls, political exposure, or slow permitting.

Think mode of entry

Ask whether Venturea actually needs to own and control the foreign activity, or whether a contract or license would capture most of the benefit with less risk.

COMPANY DOSSIER

Venturea Renewable Systems

V

Venturea is a U.S.-based renewable-energy equipment and systems company known for integrated solar-storage controls, modular microgrid design, and predictive maintenance software.

$2.4BAnnual revenue
18%International revenue
4,800Employees
11.5%R&D as % of sales
37Registered patent families
92%Service contract renewal

Firm-specific strengths

  • GridMind™ software balances generation, batteries, and demand in real time.
  • Patented thermal-management system increases battery life in hot climates.
  • Modular engineering lets Venturea configure microgrids faster than many competitors.
  • A strong reliability reputation supports premium pricing with utilities and industrial customers.
  • Remote diagnostics create recurring service revenue and valuable operating data.

Constraints

  • Venturea has limited experience managing large foreign manufacturing workforces.
  • Management will not approve a project whose normal-case payback is longer than roughly seven years without a compelling strategic rationale.
  • The company is cautious about sharing source code, control algorithms, and battery-management know-how with unrelated third parties.
  • Because the four proposals compete for the same capital allocation, only one can be selected this cycle.
Cultural baseline carried forward from the Four Lands series.

The country profiles below retain the established contrast among the Four Lands: Zandora is a relatively stable, market-oriented democracy; Brayland is more authoritarian and politically exposed; Noveria combines a pro-renewables policy environment with a strong production base; and Eryndor offers useful industrial assets but requires more patience and operational adaptation. Cultural indicators are presented as fictional scenario scores on a 0–100 scale for comparative classroom use.

PROJECT A

Zandora: Solar + Storage Integration Hub

Z
PROPOSED ENTRY

Wholly owned greenfield assembly and regional service center

Capital request: $168 million • Target opening: 30 months • Regional export capability included
$612BGDP (PPP)
5.1%Real GDP growth
3.4%Inflation
5.8%Unemployment
79%Urban population
$14.80/hrSkilled technical labor

Location conditions

  • National renewable target: 55% of electric generation by 2035.
  • Eight-year reduced corporate tax rate for qualifying clean-energy manufacturers.
  • Port-to-industrial-zone transit averages 2.1 days; customs clearance is digitized.
  • Engineering universities graduate roughly 18,000 STEM students annually.
  • Grid modernization program is expected to create $4.6B in utility procurement over five years.
  • Foreign firms may own 100% of qualifying manufacturing subsidiaries.

Social + cultural indicators

IndicatorZandoraU.S.
Power distance4140
Individualism7291
Uncertainty avoidance4746
Long-term orientation6126
Tertiary attainment, ages 25–3449%—
Internet access93%—
Operating issue: protect the control platform or outsource it?
Two Zandoran electronics firms have offered to assemble Venturea control units under contract for about 9% less than Venturea's projected internal unit cost. However, doing so would require sharing firmware interfaces, testing protocols, and some diagnostic logic. Zandoran IP law is generally reliable, but Venturea management considers GridMind™ the company's most important differentiator.
Customer issue: why manufacture locally?
Three large utilities indicate that local service capacity and guaranteed spare-parts availability will be weighted heavily in public tenders. Products assembled inside Zandora also qualify for a 7% domestic-content preference in government-linked projects.
PROJECT B

Noveria: Smart Inverter Manufacturing Platform

N
PROPOSED ENTRY

Acquire and modernize an existing inverter plant

Capital request: $142 million • Target restart: 18 months • Acquisition includes 620 employees
$487BGDP (PPP)
4.4%Real GDP growth
4.1%Inflation
6.4%Unemployment
72%Urban population
$10.90/hrSkilled technical labor

Location conditions

  • Large existing supplier cluster for power electronics, aluminum housings, and industrial sensors.
  • Government incentive reimburses 16% of qualifying modernization investment after commissioning.
  • The acquired plant sits 38 km from a major freight rail terminal and 140 km from a deep-water port.
  • Renewable installations are growing about 12% annually from a smaller base than Zandora.
  • Commercial courts are considered predictable, though case resolution can be slow.
  • Plant productivity is currently 22% below Venturea's U.S. benchmark but management believes automation can close most of the gap.

Social + cultural indicators

IndicatorNoveriaU.S.
Power distance5640
Individualism5891
Uncertainty avoidance6346
Long-term orientation6726
Tertiary attainment, ages 25–3444%—
Vocational/technical credentials31%—
Operating issue: acquisition versus licensing
The seller is willing to license the plant's local brand and distributor network instead of selling the factory. Licensing would cut Venturea's up-front commitment by more than half. However, the licensee wants the right to source selected electronic components locally and asks for access to Venturea's diagnostic software APIs. Venturea's engineers worry that product quality and data security would be harder to control.
Workforce issue
The plant has experienced little turnover, but supervisors rely on formal procedures and centralized approval. Venturea's U.S. facilities use flatter teams and continuous-improvement groups. The acquisition budget includes a two-year management-development and process redesign program.
PROJECT C

Eryndor: Grid-Scale Battery Conversion Project

E
PROPOSED ENTRY

Brownfield conversion of a former electrical-equipment complex

Capital request: $126 million • Target opening: 42–54 months • Site sold by regional development authority
$355BGDP (PPP)
3.2%Real GDP growth
5.8%Inflation
8.1%Unemployment
66%Urban population
$8.40/hrSkilled technical labor

Location conditions

  • Existing heavy-electrical workforce and an underused industrial site reduce construction needs.
  • Battery-storage demand is projected to triple over seven years as the grid adds intermittent renewable generation.
  • Incentive package covers up to 20% of eligible capital spending, but reimbursement occurs only after employment and export milestones are met.
  • Permitting currently averages 24–30 months because environmental approvals are handled sequentially.
  • Freight infrastructure is adequate but not high-performing; seasonal congestion affects the main port.
  • Government has proposed a one-stop permitting reform, but implementation is not scheduled until next fiscal year.

Social + cultural indicators

IndicatorEryndorU.S.
Power distance6240
Individualism4991
Uncertainty avoidance7846
Long-term orientation7226
Tertiary attainment, ages 25–3437%—
Public support for renewable investment74%—
Timing issue: attractive site, slow path to cash flow
The brownfield site can be purchased for roughly 35% less than building an equivalent facility from scratch. Yet the current approval process makes the earliest realistic production date more than three and a half years away. A staged approach—site remediation first, followed by equipment installation after permitting reform—could improve project economics if management accepts a longer investment horizon.
Internalization issue
A respected Eryndorian utility contractor proposes a joint operating company and could accelerate customer access. It wants a 40% ownership stake and operational visibility into battery algorithms. Venturea can legally own the project outright, but doing so could lengthen local customer development.
PROJECT D

Brayland: Wind + Storage Manufacturing Complex

B
PROPOSED ENTRY

Majority-owned manufacturing complex with required state-linked partner

Capital request: $111 million • Target opening: 24 months • Venturea maximum ownership: 60%
$271BGDP (PPP)
6.0%Real GDP growth
9.2%Inflation
10.6%Unemployment
61%Urban population
$5.60/hrSkilled technical labor

Location conditions

  • Fast-growing electricity demand and low labor costs are initially attractive.
  • Government offers duty-free import of production equipment for approved investors.
  • Foreign investors must use a state-approved local partner for strategic energy assets.
  • Dividend repatriation above $25M annually requires central-bank approval.
  • Rules governing imported control software changed twice during the last three years.
  • Regional security tensions periodically disrupt a land corridor used for imported components.

Social + cultural indicators

IndicatorBraylandU.S.
Power distance8340
Individualism3191
Uncertainty avoidance7146
Long-term orientation3826
Tertiary attainment, ages 25–3424%—
Female labor-force participation39%—
Ownership issue: compulsory partner
The required partner is a large industrial group chaired by a former energy ministry official. It can secure permits quickly but insists on joint control over procurement and hiring. Its proposed shareholder agreement gives the partner broad rights to inspect technical documentation used at the factory.
Internalization issue: can Venturea protect its advantage?
Venturea could restrict the Brayland plant to lower-value mechanical assembly and keep GridMind™ servers outside the country. Doing so would reduce IP exposure, but it would also eliminate much of the production integration that originally justified the project and reduce the plant's expected margin.
ANALYST WORKBENCH

Compare the four proposals

Use this table as a starting point, not as a substitute for analysis. A lower cost may be attractive, but your paper must explain whether Venturea has an ownership advantage, whether the country creates a location advantage, and whether internal control is more valuable than contracting or licensing.

IndicatorZandoraNoveriaEryndorBrayland
Capital request$168M$142M$126M$111M
Expected operating start30 mo.18 mo.42–54 mo.24 mo.
Real GDP growth5.1%4.4%3.2%6.0%
Skilled technical labor$14.80/hr$10.90/hr$8.40/hr$5.60/hr
Foreign ownership permitted100%100%100%60% max.
IP / contract environmentStrongModerately strongModerateWeak / volatile
InfrastructureStrongStrongModerateUneven
Policy / regulatory predictabilityHighModerate-highModerateLow
Market / sector demandHighHighEmerging, long-termHigh but exposed

Ownership questions

  • Which Venturea assets matter for this project?
  • Are they transferable across borders?
  • Do they overcome foreign-market disadvantages?
  • Could a local firm copy or substitute for them?

Location questions

  • Why perform the activity there?
  • What do demand, labor, logistics, policy, and skills contribute?
  • What risks reduce the location advantage?
  • Does timing change the answer?

Internalization questions

  • Why own rather than license or contract?
  • How important are quality, IP, data, and coordination?
  • Would a partner lower risk or create new risk?
  • What is lost when control is shared?
Do not average three OLI scores. OLI is a logic framework. Your strongest recommendation will show how the three advantages reinforce one another and will explain why competing projects are less compelling.
BRIGHTSPACE SUBMISSION

Writing Assignment: Venturea's OLI Investment Recommendation

Length: 2–3 pages of body text, plus title and reference pages. Format: APA style. Submission: Upload your completed paper to the designated Brightspace assignment folder.

Make one recommendation

Select one of the four proposed Venturea investments. Your job is not merely to identify a good country; you must recommend the project that offers the strongest overall case for foreign direct investment.

Apply all three OLI components

Organize the body of the report around Ownership, Location, and Internalization. Use specific evidence from this packet to explain why the selected project satisfies each component. At least one paragraph should explicitly compare your recommendation with one competing proposal.

Use evidence, not labels

Do not write that a country has a “good location advantage” without explaining why. Cite relevant facts such as market growth, labor and technical capacity, incentives, logistics, ownership rules, IP exposure, workforce characteristics, cultural differences, regulatory predictability, or project timing.

Address a meaningful tradeoff

Every proposal contains strengths and weaknesses. Identify at least one disadvantage of your recommended option and explain why the project remains preferable despite that weakness—or what Venturea should do to manage it.

Conclude with an actionable recommendation

End by clearly stating what Venturea should do. Your conclusion should make clear why FDI is preferable to a lower-control alternative for the selected project.

Suggested APA-style organization

SectionWhat to accomplish
Introduction / RecommendationIdentify the selected project and state your thesis: why it provides the strongest FDI case.
Ownership AdvantageApply Venturea's proprietary technology, brand, systems knowledge, service capability, or other firm-specific strengths to the project.
Location AdvantageUse country and project data to explain why the relevant business activity belongs in that market.
Internalization AdvantageExplain why Venturea should control the activity rather than rely primarily on licensing, contracting, or a low-control partner arrangement.
Comparison + ConclusionAddress at least one rival option, acknowledge a tradeoff, and restate the recommended investment.

Evidence expectations

  • Use multiple specific data points from the country/project profiles.
  • Use the cultural information where it materially affects management, workforce integration, risk, or execution; culture should support the OLI analysis rather than replace it.
  • When referencing Dunning's Eclectic Paradigm/OLI framework, include an APA in-text citation and a corresponding reference.
  • The Four Lands data are fictional scenario data. In an APA reference list, cite this packet/course resource as course material rather than presenting the fictional statistics as independently published national data.

Assessment criteria

OLI ApplicationAccurately applies Ownership, Location, and Internalization to Venturea and the selected project rather than simply describing the country.
Evidence + ComparisonUses relevant scenario data, recognizes tradeoffs, and compares the recommendation with at least one alternative.
Quality of RecommendationPresents a logical, supportable FDI recommendation that follows from the analysis.
Clarity + OrganizationUses a clear thesis, effective headings/transitions, and concise professional writing.
APA StyleUses appropriate APA formatting, in-text citations, and references.
Key question to keep in view: “Why should Venturea own this activity in this particular foreign market rather than serve the market from the United States or hand the activity to another firm?”